Home Renovation Permit
PermitsHub handles your home renovation permit application, drawings, and approvals across Toronto and the GTA.

Scope of service.
Home renovation permits in Toronto are required when you alter, repair, or add to the structural elements of your home. This includes removing or adding walls, changing room layouts, structural beam installations, window or door enlargements, basement finishing that involves plumbing or structural changes, and second-storey additions. The City of Toronto and GTA municipalities require these permits to ensure renovations meet Ontario Building Code standards for structural integrity, fire safety, and occupant protection. Many homeowners underestimate the documentation required. Building departments need architectural drawings showing existing and proposed conditions, structural calculations for load-bearing changes, HVAC plans if you're altering heating systems, and zoning compliance confirmation. Missing or incomplete submissions cause delays that can halt construction for weeks. PermitsHub prepares complete applications with all required drawings and supporting documents, manages the submission process, and responds to any reviewer questions until your permit is approved.
- Interior wall removal or addition (load-bearing and non-load-bearing)
- Basement renovations including new or relocated plumbing fixtures
- Kitchen and bathroom renovations involving structural or mechanical changes
- Window and door enlargements or new openings in exterior walls
- Second-storey additions and vertical expansions
- Structural beam installations and foundation underpinning
Who needs this
You need a home renovation permit if your project involves structural changes, adds or relocates plumbing or electrical systems beyond simple replacements, alters exterior walls or rooflines, or finishes previously unfinished space like basements or attics. Cosmetic work like painting, flooring, or cabinet replacement typically does not require a permit.
Included as standard
- City-compliant permit drawings
- Zoning & by-law review
- Application submission
- Revision management
Four steps to an approved permit.
01
Consultation
Free scoping call to review your project, lot and goals. No pressure, no fee.
02
Drawings & Zoning
City-compliant permit drawings and full zoning compliance review.
03
Submission
Application filed with the City. We manage every revision round to closure.
04
Permit Approved
Stamped permit in hand. Ready to build with confidence.
Express City fast-lane available for eligible small residential projects - timeline depends on project type and City queue
Home Renovation Permit - your questions
You might also need.
Get started
Ready to start your home renovation permit?
Free, no-pressure quote within one business day.
● Flat-rate quotes - no surprise fees
● Revisions included until approval
● Most enquiries responded to same day